Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!

Building Automation Knowledge Base

Schneider Electric Building Automation Knowledge Base is a self-service resource to answer all your questions about EcoStruxure Building suite, Andover Continuum, Satchwell, TAC…

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • Knowledge Center
  • Building Automation Knowledge Base
Options
  • My Knowledge Base Contributions
  • Subscribe
  • Bookmark
  • Invite a Friend
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Labels
Top Labels
  • Alphabetical
  • Andover Continuum 2,209
  • TAC Vista 2,045
  • EcoStruxure Building Operation 1,851
  • TAC IA Series 1,825
  • TAC INET 1,458
  • Field Devices 721
  • Satchwell BAS & Sigma 474
  • EcoStruxure Security Expert 334
  • Satchwell MicroNet 252
  • EcoStruxure Building Expert 228
  • EcoStruxure Access Expert 149
  • CCTV 53
  • Project Configuration Tool 47
  • EcoStruxure Building Activate 17
  • EcoStruxure Building Advisor 12
  • ESMI Fire Detection 10
  • Automated Engineering Tool 5
  • EcoStruxure Building Data Platform 3
  • EcoStruxure Workplace Advisor 1
  • EcoStruxure for Retail - IMP 1
  • Previous
  • 1 of 2
  • Next
Top Contributors
  • Product_Support
    Product_Support
  • DavidFisher
    DavidFisher
  • Cody_Failinger
    Cody_Failinger
See More Contributors
Related Products
Thumbnail of EcoStruxure™ Building Operation
Schneider Electric
EcoStruxure™ Building Operation
4
Thumbnail of SmartX IP Controllers
Schneider Electric
SmartX IP Controllers
1
Thumbnail of EcoStruxure™ Building Advisor
Schneider Electric
EcoStruxure™ Building Advisor
1

Related Forums

  • Intelligent Devices Forum

Previous Next

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite

Building Automation Knowledge Base

Sort by:
Date
  • Date
  • Views
  • Likes
  • Helpfulness
Options
  • Subscribe
  • Bookmark
  • Invite a Friend
  • « Previous
    • 1
    • …
    • 466
    • 467
    • 468
    • …
    • 508
  • Next »

Actuator for VGS211F

Issue Which actuator is suitable for valve VGS211F? Environment VGS211F: VGS211F-15CS04 VGS211F-15CS05 VGS211F-15CS07 VGS211F-15CS08 VGS211F-20CS VGS211F-25CS VGS211F-32CS VGS211F-40CS VGS211F-50CS VGS211F-65CS VGS211F-80CS VGS211F-100CS Forta: M700 MG900SR M800 M1500/MV15B M3000 Cause Application assistance. Resolution Depending on application,  the Forta range actuators are suitable: M700, MG900SR, M800, M1500/MV15B, M3000.   For more information ad details, please see the VGS211F data sheet.
View full article
Picard Product_Support
‎2018-09-06 10:20 AM

Labels:
  • Field Devices
2092 Views

MVB46 actuator for V311T

Issue Will a MVB46 fit straight onto a V311T valve?   Environment Controlli / Satchwell MVB46 TAC Forta Cause Controlli actuator on Schneider Electric / TAC valve Resolution   The Forta series actuators are suitable for use on the V311T valve. The data sheet for V311T has the different size Forta actuators listed, depending on application requirements.
View full article
Picard Product_Support
‎2018-09-06 10:20 AM

Labels:
  • Field Devices
1008 Views

Equivalent / replacement for actuator MS61-7203 from the European portfolio

Issue Needs a European replacement for a US product. Environment MS61-7203 AV-822 linkage kit TAC Forta Cause Replacing US portfolio product from EU equivalent. Resolution Use the TAC forta actuator that suits the application best. Together with linkage kit AV-622 this will fit most of the valves where the MS61-7203 fits.
View full article
Picard Product_Support
‎2018-09-06 10:20 AM

Labels:
  • Field Devices
948 Views

Which replacement actuator for MZ88T?

Issue MZ88T is obsolete.  Environment MZ88T: 8455011000 8455013000 8455015000 MZ140-230T MZ140-24T MZ140-24M Cause Obsolete actuator needs replacement.  Resolution MZ88T series is replaced by the MZ140 series: MZ88T (230) is replaced by MZ140-230T MZ88T (24) is replaced by MZ140-24T MZ88TA is replaced by MZ140-24M
View full article
Picard Product_Support
‎2018-09-06 10:20 AM

Labels:
  • Field Devices
1184 Views

AC256 Micro Energy Power Supply voltage reading and the port connection.

Warning Electrostatic Discharge Required: Always discharge static electricity from your person by touching metal prior to handling any hardware. Failure to do so may result in damage to devices. Issue How should the Micro Energy Power Supply voltage reading be checked? Can the Micro Energy Power Supply provide power to IOU only without CIU connected? Environment Infinity SX8000 Cause Got the Micro Energy Power Supply repaired by 3rd party but the voltage reading seems to be incorrect. Resolution The voltage of the Micro Energy Power Supply should be checked with the load connected to the PS.   For the port_A voltage check, have the CIU connected to the port_A of the PS.   For the port_B voltage check, have the IOU connected to the port_B of the PS. Also the Micro Energy Power Supply can have either the port_A connected to CIU only or the port_B connected to IOU only or both ports connected to CIU and IOU respectively. For detail information of the voltage reading of each pin, please refer to page 2-86 ~ 2-88 of the AC256 Service Manual.pdf
View full article
Picard Product_Support
‎2018-09-06 10:20 AM

Labels:
  • Andover Continuum
1676 Views

Unable to remove editlock from Continuum Objects

Issue Objects appear to be edit locked, however no asterisk appears in the editor title bar. Environment Cyberstation Continuum Users Cause Continuum user permissions had been restricted. Resolution Restored full edit permissions to Continuum User.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1259 Views

Can an alarm be configured to close the current graphic before launching the alarmed points graphic?

Issue How can an alarmed point be configured to close the currently active graphic before launching the graphic points alarm graphic. Environment Pinpoint Alarm Graphic Cause Using the Display Graphic action on an Event View, it is necessary to have only one alarm graphic open at a time. Resolution Event Notifications provide for the launching of specific graphic panels when a point goes into alarm. No provision exists for closing having this alarm close the currently active graphic panel before it' launches its graphic.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1047 Views

Sigma log data to record the value every 15 minutes synchronized to the hour

Issue A new utility is being used to record log data and store it in the "cloud". It has been requested that the log data have timestamps every 15 minutes synchronized to the hour.  Environment Sigma Trend Log Log data Log set Logging Timestamp Cause There is no mechanism with Sigma to specify when a log set starts to process the logging data. When set to log at timed intervals the log bucket file is downloaded to the controller and processed. The timed interval then starts from that time. There have been some requests for data to be synchronized to the hour with 15 minute log intervals. Resolution There is a engineering workaround to make Sigma do this. A prog point will be needed for every value that is required to be logged. The text is below. 10 XFlo = POINT 0|41 - Object to be logged 20 IF MINUTE = 0 OR MINUTE = 15 OR MINUTE = 30 OR MINUTE = 45 THEN GOTO 40 30 RETURN VIA TEXT 92 VALUE YFlo 40 IF SECOND DOWN THEN GOTO 60 50 RETURN VIA TEXT 92 VALUE YFlo 60 YFlo = XFlo 70 RETURN VIA TEXT 92 VALUE YFlo Then setup the log set with the log data set to "change of value".
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Satchwell BAS & Sigma
967 Views

Field Devices - What grade of stainless steel is used in the Satchwell DWA range of sensor pockets?

Issue What grade of stainless steel is used in the Satchwell DWA range of sensor pockets Environment Sensor Pockets DWA Satchwell Cause Customer requires assurance that the stainless steel pockets are the correct grade. Resolution The DWA (Satchwell range) pockets that we sell are made from 316Ti steel. We use 316Ti rather than the 316L because of elevated temperature mechanical strength, pitting corrosion resistance, mechanical polishing and weldability.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Field Devices
985 Views

Field Devices - What mains actuator can be used with a VTRA rotary valve?

Issue What mains actuator can be used with a VTRA rotary valve? Environment VTRA Actuator Mains Cause Existing actuator has failed and is no longer available. Resolution The replacement actuator and linkage are required; M9B-230 actuator - 860-1020-000 Linkage - 860-0990-000
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Field Devices
876 Views

ACX7xx swipe of unknown card results in reader LED blinking slowly

Issue ACX7xx (ACX701, ACX781) swipe of card that is not in DB results in reader LED blinking slowly for over a minute. Then an access events 'No response from access server' is logged in the access event log. Product Line Andover Continuum Environment CyberStation ACX701 ACX781 Cause AccessServer system variable set to an incorrect value. For example, a value of 1 will cause the ACX to attempt a remote validation to the controller with ACCNetId of 1, whether it exists or not. Resolution Set the AccessServer to 0 (zero) if not remote validation is desired, or set it to the ID of the Primary Access Server workstation. NOTE: The old ACXs require a reset when the value of AccessServer is changed. After making the changes reload the controller.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1236 Views

Can Continuum Extended logging be configured on point with a Log Interval of less that 60 seconds.

Issue Can Continuum Extended logging be configured on point with a Log Interval of less that 60 seconds. Environment Continuum CyberStation Extended Logging Cause The project spec calls for extended logging of point with a 5 second log interval. Resolution While it is possible to configure extended logging points for intervals of 1 to 59 seconds, this is not recommended.  Continuum should notify the operator that this is not recommended when the point is configured.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
999 Views

It appears the Dynamic DEMUX object in R2 - LonWorks jar - Conversions folder is not setting the output bits incorrectly for some SNVT_State values?

Issue It appears the Dynamic DEMUX object in R2 - LonWorks jar - Conversions folder is not setting the output bits incorrectly for some SNVT_State values? Environment R2, all versions Cause Third party definition of the SNVT_State bits. Resolution The dynamicDEMUX object takes a "SNVT_State" value in and breaks it into representative output bits 0 to 15.  This object assigns the bits from bit0 to bit15 with bit0 on the left and counting left to right.  For example a SNVT_State value of 1000 hex is 1000000000000000 in binary, therefore the DEMUX object would show bit0 on.  Some third party manufacturers define their SNVT_State bits starting with bit15 on the left and counting down left to right ,so in this example their documentation would indicate bit15 should be on .  Once this is understood the DEMUX output bits can be interpreted correctly.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • TAC IA Series
866 Views

Card readers are continuously in "power up" sequence when connected to an ACX5740

Issue ACX5740 appears normal when powered up but as soon as a card reader is wired, the card reader is continuously in "power up" sequence whether reader voltage is set to 5V or 12V. The reader is designed for either of these voltages. Environment ACX5740, ACX5720 Cause The ACX5740 power input was miswired at the power supply. It was being powered from the battery charging circuit instead of the DC output of the power supply. The charging circuit apparently uses a pulsing 24V DC voltage designed to recharge a battery. When powering the ACX (designed  to accept 10-28VDC) it looks normal at first. However, the pulsing of the reader power output is not within the card reader input voltage specs.  Resolution The ACX5740 power was miswired. It was being powered from the battery charging circuit instead of the DC output of the power supply. Proper wiring to the power supply DC output fixed the issue.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1058 Views

Every b3 wireless controller can be brought online, but no two wireless controllers can be online at the same time

Issue Every b3 wireless controller can communicate with BCX1 separately, but when there is a b3 wireless controller is online, the other controller can't be brought  online, the online controller must be powered off or remove the adapter, otherwise, the others will never be online. Environment Continuum Cyberstation BCX1 wireless B3 wireless Cause If the wireless adapter and wired RS485 was connected, this issue will happen. Resolution Remove the wired RS485 connector from the controller or disconnect the MS/TP bus, From the Comm2 port of BCX1, click "learn", All the b3 wireless controller will come online quickly
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1439 Views

Sensors without using pockets, for Kamstrup meters

Issue Which sensors can be used if mounted directly into the pipe, without pockets? Environment Kamstrup heat cool flow meters Cause In some applications, sensors mounted directly into the pipe, without using pocket, is requested. Resolution Unfortunately, we do only recommend the sensors that are included with the meter package, or ordered as an option with longer cords. All are requiring pockets for proper mounting. 
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Field Devices
1075 Views

Does the DMS Ethernet NIM settings get saved with a DMS database 'backup' command?

Issue An installation has a DMS-3500 with an Ethernet NIM (Network Interface Module) and some MicroSmart controllers.  As part of a regular maintenance visit, a database backup is done.  What is considered a complete backup including the NIM's settings? Environment DMS OPRIF 11.4 & 11.6 Cause Database changes requiring a backup in the event a re-install is required Resolution A complete DMS database backup typically involves two steps:  a backup of the DMS database and a backup of each individual MicroSmart controller database. In addition, on an installation with ethernet NIMs, its configuration data is backed up as a separate step.   All three backup steps are done with OPRIF. Note:  Echelon NIMs do NOT require backing up.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • TAC IA Series
1798 Views

Bacnet communications issues, cannot find 3rd party bacnet IP devices

Issue Cannot find third party bacnet IP devices Environment BACnet Third party device Find bacnet devices Cause Default router address was incorrectly configured in the third party device. Resolution Corrected the default router address configuration in the third party device.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1989 Views

When the ENC is set up to pull weather data from the Enterprise Server the ENC's Application Director starts spewing out provisioning errors.

Issue When the ENC is set up to pull weather data from the Enterprise Server the ENC's Application Director starts spewing out provisioning errors. Environment I/A Series G3 Cause When set up to do this the ENC uses provisioningNiagara functionality and requires that module be present in the ENC Resolution Install the provisioningNiagara module in the ENC.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • TAC IA Series
1113 Views

What gender are the DB-25 connectors on the DM-20, DIO-20 and DO-20?

Issue Need to know the connector genders to order the interconnecting ribbon cable. Environment DO-20 DM-20 DIO-20 Cause Not in the documentation for the DO-20. Resolution All three have a female DB25 connector. Also, the interconnecting cable from the DM-20 to the DO-20 or DIO-20 is a straight-through 25 conductor cable.
View full article
Picard Product_Support
‎2018-09-06 10:19 AM

Labels:
  • Andover Continuum
1792 Views
  • « Previous
    • 1
    • …
    • 466
    • 467
    • 468
    • …
    • 508
  • Next »
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of