Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Link copied. Please paste this link to share this article on your social media post.
Introducing the latest release of firmware version 4.6.0 for the PowerLogic™ Advanced Meters. This update brings several significant enhancements to improve functionality and security. Here are the top changes found in the latest firmware:
Upgrade to firmware version 4.6.0 today to take advantage of these powerful new features.
Please find the download links for firmware below:
https://www.se.com/us/en/download/document/ION9000_meter_FW_v004_006_000/
https://www.se.com/us/en/download/document/ION7400_meter_FW_v004_006_000/
https://www.se.com/us/en/download/document/PM8000_meter_FW_v004_006_000/
Additional Documentation:
BACnet Certificate: Download
Link copied. Please paste this link to share this article on your social media post.
Thank you for the information and for sharing the new update on FW V4.6.
Best Regards,
-Mehran
L3 Expert Advanced metering
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
The new update does not enable me to add the meter on Ecostruxure Power Commission project, from EPC version 2.35 to 2.36. This is concerning the PM8210 meters, when the firmware version is reverted to 004.005.00, the power meter can be added to a project. Please assist
Link copied. Please paste this link to share this article on your social media post.
Hello @Chief2403 ,
In V4.6.0 Firmware, the function code 43 behavior was changed to allow for new meters to provide additional information. This change will make existing meters not return information in the same place EPC is currently using. EPC team is aware and firmware team is working with them.
Regards,
Charles
Link copied. Please paste this link to share this article on your social media post.
Ok thanks for the update and with regard to PM5580 and PM5560, some of the meters do not show the normal webpage interface and thus the default username and passwords don't work. I have tried updating them to 4.4.5 from version 4.3.2. Some allow and some don't. What could be the cause?
Kind Regards
Chief Choshane
Link copied. Please paste this link to share this article on your social media post.
Hello @Chief2403 ,
Recommend to start a new topic on this question rather than reply to a topic unrelated to PM5000 series of meters.
Regards,
Charles
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of