Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Link copied. Please paste this link to share this article on your social media post.
Dear Colleagues,
In the Schneider FAQ in the
What PM800 resets are available in ION Setup 3.0
topic the method is written to add new reset functions to ION 3 setup.
Based on this I would like to expand ION 3.0 menu for PM8000 with the following points:
- enable EN50160 evaluation
- reset EN50160 evaluation results
- acknowledge and reset active alarms log
- acknowledge and reset historcal alarms log
May I ask anybody to help me on this. How to do this?
Thanks, Laszlo
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
try to go to C:\Program Files\Schneider Electric\ION Setup\Tables\PM8000\Version 2.0 Default (depends on what version you want)
edit RealTime.pml with notepad add last line on page2 bye imitate the reset control
for enable or disable use Enables.pml then do the same thing.
You must know the handles (in Hexadecimal) of the external pulse and external Boolean to be use.
Link copied. Please paste this link to share this article on your social media post.
thanks Bojan
Link copied. Please paste this link to share this article on your social media post.
thanks Yut, let us try as you described !
Link copied. Please paste this link to share this article on your social media post.
Yut, you said: "You must know the handles (in Hexadecimal) of the external pulse and external Boolean to be use."
How and from where?
Anyway I made a mistake this is needed for PM8000 (and not PM800) for my SI partner. Is it the same process for PM8000?
Sorry for inconvenience ...
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.