PM8240 and PM5110: Modbus Points for Meter Powerup and Meter Normal / Failure
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2015-10-0408:28 PM
PM8240 and PM5110: Modbus Points for Meter Powerup and Meter Normal / Failure
Dear All
We have a project in Hong Kong that a SCADA requires the following points from PM8240 and PM5110 meters.
1. Meter power on
2. Meter normal / failure
For PM5110, should we use the points of Meter Powerup (Control Power Loss) [register: 13623] and Meter Diagnostic [register: 13625 ] for meter power on and meter normal respectively? What will the output for these two points, e.g. Meter Diagnostic = 1 is normal, Meter Diagnostic = 0 is failure?
For PM8240, should we use the points BIST in the Diagnostic module as meter normal / failure? But we have no ideal about the points of meter Powerup which needs your advice.
Would you please suggest which Modbus points we should use?