Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2024-11-1311:13 PM
Meters for NABERS requirements for a hospital
Hi Xperts,
We would like to ask if IEM3255-NMI meters and PM3250 would satisfy the requirements of NABERs to be used as utility and non utility meters respectively in terms of data intervals? If the said meters does not meet the requirements, can you please suggest which meters to use?
I would possibly suggest reaching out to your local Schneider sales team, local EcoExpert or Distributor (Sorry I do not have a list for you). Different regions may have different certification that are specific to that region. Another possible place to get help is the Customer Care team, se.com -> support -> Contact support.