Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

We Value Your Feedback!
Could you please spare a few minutes to share your thoughts on Cloud Connected vs On-Premise Services. Your feedback can help us shape the future of services.
Learn more about the survey or Click here to Launch the survey
Schneider Electric Services Innovation Team!

ION7650-8800 voltage wiring in MV systems for EN50160

Metering & Power Quality

Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • EcoStruxure Power & Grid
  • Metering & Power Quality
  • ION7650-8800 voltage wiring in MV systems for EN50160
Options
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
Charles_Murison
Picard Charles_Murison Picard
477
Ramasamy_N
Captain Ramasamy_N Captain
113
Robert_Lee
Admiral Robert_Lee Admiral
92
Mehran_Mehrnia
Captain Mehran_Mehrnia Captain
85
View All

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Back to Metering & Power Quality
sesa216946_brid
sesa216946_brid Schneider Alumni (Retired)
Schneider Alumni (Retired)

Posted: ‎2013-08-20 03:08 AM

0 Likes
4
1118
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2013-08-20 03:08 AM

ION7650-8800 voltage wiring in MV systems for EN50160

I propose here a method we are using in Italy to allow ION meters with EN50160 framework to correctly detect and classify the voltage events when installed in MV systems.

EN50160 states that, for MV systems, all the voltage events have to be evaluated using line-to-line voltages. This method shows how to allow it even when the voltage measures are transduced by 3 PTs wired line-to-earth.

Has anyone already faced the same issue and has already found a different solution (maybe via framework programming)?

Of course, any comment or advice about our proposed solution in the attached file is welcome.

Thank you

Attachments
Reply
  • All forum topics
  • Previous Topic
  • Next Topic
Replies 4
aaron_azzo_com_
Ensign aaron_azzo_com_
Ensign

Posted: ‎2014-11-16 05:44 PM

0 Likes
1
1009
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2014-11-16 05:44 PM

Thanks for the proposed solution Francesco.

Currently we have a ION 7650 on a HV installation.  The L-L is 11kV (Delta), but the secondary on the PT's is 110V L-L (we had to use L-L to power the meter on the auxiliary, as L-N would damage it and not allow power up).  There are three PT's (primary and secondary are Wye), and we currently have the active side of each PT going to V1, V2, & V3 on the 7650.  The Installation Guide does not give any reference to a system that has three VT's (or PT's) that I can see, so is this installation suggestion best practice?  It makes sense in theory, but do we have the backing of Schneider to actuate this in the field?

Reply
JamesAZZO
Sisko | EcoXpert Master JamesAZZO Sisko | EcoXpert Master
Sisko | EcoXpert Master

Posted: ‎2014-11-17 05:33 AM

0 Likes
0
1009
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2014-11-17 05:33 AM

can you give Aaron any insight?

Reply
Anonymous user
Not applicable

Posted: ‎2014-11-17 02:23 PM

0 Likes
1
1009
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2014-11-17 02:23 PM

We also come across this configuration of PT's for MV systems quite often.  It is a standard PT installation configuration for a lot of protection relays.  As it is much easier to use existing PT's for a retrofit MV installation, it would really help if Schneider provide a wiring diagram for the ION7650's that supports this PT configuration.  Would likely help us sell a few more ION7650's for existing sites as well.

Reply
JamesAZZO
Sisko | EcoXpert Master JamesAZZO Sisko | EcoXpert Master
Sisko | EcoXpert Master

Posted: ‎2014-11-18 09:31 PM

0 Likes
0
1009
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2014-11-18 09:31 PM

Is this factory supported ?

Reply
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of