Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2024-07-0211:17 PM
【HDPM6000】 corner-grounded delta systems
Hello,
Why should HDPM6000 not be used for corner-grounded delta systems?
The manual says it can be applied if it is for ungrounded delta. The manual states that the wiring for phase B at that time should be connected to the N terminal.
I need advice as to why this is not applicable to corner-grounded delta systems.
As per design, and as mentioned in Installation Guide, HDPM6000 head unit is capable of measuring the voltage for the following Supply Types: Delta 3-Wire ungrounded Delta High-Leg 4-wire Wye 3-wire Split-phase
HDPM6000 may not have the necessary algorithms or hardware to accurately and safely handle the unique characteristics of corner-grounded delta systems.
As per design, and as mentioned in Installation Guide, HDPM6000 head unit is capable of measuring the voltage for the following Supply Types: Delta 3-Wire ungrounded Delta High-Leg 4-wire Wye 3-wire Split-phase
HDPM6000 may not have the necessary algorithms or hardware to accurately and safely handle the unique characteristics of corner-grounded delta systems.