Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
EM3570
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2025-09-1008:03 AM
EM3570
Good day Team
Could you please provide clarification regarding the EM3570 meter:
Tariff switching is triggered by a change in the input status ofS-In. Will this input change cause the meter to switch registers for kWh readings, or will it continue recording on the same register?
In the EM3570 meter, when the S-In input triggers a tariff change, the meter switches to a different kWh register corresponding to the active tariff, allowing energy to be recorded separately for each tariff.