Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-03-1510:26 AM
Hi Larry,
By default, the self-test is run each time the UPS is started and then every 14 days after that.
You could run a self-test on each system so they would be in sync. The drawback is that if the UPS is restarted, you must re-sync when the remainder run their test.
A solution is to set the test to never and set a reminder to run the test manually or run via SSH or SNMP scripting. Using SSH/CLI the command is UPS -s start.