Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
SURT10000RMXLI charging current and USA operation
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2811:33 PM. Last Modified: 2024-03-1402:46 AM
SURT10000RMXLI charging current and USA operation
I'm assembling a system for use in Europe and as such have chosen the SURT10000RMXLI model UPS.
I have two questions regarding this model and using it temporarily in the United States during system development activities:
1) Can anyone recommend a transformer to power this UPS from USA 208/120V three phase feed?
2) What is the maximum recharging current? Equipment load on this UPS will only be about half of the rated UPS capacity, so I'm trying to determine the required sizing of transformer/cabling/breakers on the UPS input feed.