Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Search in
Improve your search experience:
Exact phrase→Use quotes " "(e.g., "error 404")
Wildcard→Use * for partial words(e.g., build*, *tion)
AND / OR→Combine keywords(e.g., login AND error, login OR sign‑in)
Keep it short→Use 2–3 relevant words, not full sentences
Filters→Narrow results by section(Knowledge Base, Users, Products)
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-10-0903:50 AM
The option to cycle power depends upon the specific model UPS. Some units have grouped outlets vs others don’t.
Identify what UPS systems have grouped vs not and what devices are connected to the same.
Cycling power to a unit without grouped outlets will cause all connected loads to lose power and restart.
You do (NOT) cycle power to a computer system unless it’s in a unknown / bricked state as a last resort! ☝️
Equipment such as switches, monitors, environmental, IoT, can be cycled. Any device that has a reboot (OS) feature whether soft / hard method should be managed this way or via KVM / IPMI, BCM, before using a brute force power cycle.
Cycling power isn’t something anyone does on a regular basis. If you do there’s an obvious problem just being ignored which points to a lack of common sense and understanding of the most basic concepts of systems.
NOTE: Do not confuse load shedding or scheduled power management with the above.