Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
BX1000 and Powerchute 8.0.1
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2809:37 PM. Last Modified: 2024-03-1411:46 PM
BX1000 and Powerchute 8.0.1
After installing Powerchute 8.0.1 single node and configure the email notification, powerchute program do no sent the e-mail notifications out and there is not test option in the software.
The software is installed in a SBS 2003 w/Exchange 2003.
Any help or guidance in this matter will be apreciate.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2809:37 PM. Last Modified: 2024-03-1411:46 PM
i assume you got a 940-0128D cable to make this configuration work since a BX1000 is designed to use powerchute personal edition? if you havent, this will not work. please confirm the cable you are using between the UPS and computer.
if using the above cable, when you log into the PCBE 8.0.1 interface, does the status report as Online? do you see anything in the event log? let me know if there is a way you know this is working for sure, let us know. i would want you to simulate a power outage to see if the UPS status changes to "on battery" instead of online since the BX1000 and PCBE will be used in simple signaling mode so that is the only information you will see.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2809:37 PM. Last Modified: 2024-03-1411:46 PM
i assume you got a 940-0128D cable to make this configuration work since a BX1000 is designed to use powerchute personal edition? if you havent, this will not work. please confirm the cable you are using between the UPS and computer.
if using the above cable, when you log into the PCBE 8.0.1 interface, does the status report as Online? do you see anything in the event log? let me know if there is a way you know this is working for sure, let us know. i would want you to simulate a power outage to see if the UPS status changes to "on battery" instead of online since the BX1000 and PCBE will be used in simple signaling mode so that is the only information you will see.