Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

We Value Your Feedback!
Could you please spare a few minutes to share your thoughts on Cloud Connected vs On-Premise Services. Your feedback can help us shape the future of services.
Learn more about the survey or Click here to Launch the survey
Schneider Electric Services Innovation Team!

PCS plus with issue: Control Board Initialization Progress

Metering & Power Quality

Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • EcoStruxure Power & Grid
  • Metering & Power Quality
  • PCS plus with issue: Control Board Initialization Progress
Options
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
Charles_Murison
Picard Charles_Murison Picard
478
Ramasamy_N
Captain Ramasamy_N Captain
113
Robert_Lee
Admiral Robert_Lee Admiral
92
Mehran_Mehrnia
Captain Mehran_Mehrnia Captain
89
View All
Related Products
product field
PowerLogic
AccuSine PCS+

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to Metering & Power Quality
Solved
tien_dat
Crewman tien_dat Crewman
Crewman

Posted: ‎2023-05-08 09:13 AM

0 Likes
3
2073
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2023-05-08 09:13 AM

PCS plus with issue: Control Board Initialization Progress

Hello Communities,

I met the issue with PCS Plus during commissioning as below "Control Board Initialization Progress…” Could you help me with this case?

 

Thank you

 

  • Thumbnail of AccuSine PCS+
    PowerLogic
    AccuSine PCS+
View products (1)
Attachments
Labels
  • Labels:
  • Power Quality
Tags (1)
  • Tags:
  • english
Reply
  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
Arunprasad
Lt. Commander Arunprasad Lt. Commander
Lt. Commander

Posted: ‎2023-05-09 11:36 AM

1 Like
2
2038
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2023-05-09 11:36 AM

Hello Tien Dat

"Control Board Initialization Progress…” means, it is try to reboot by itself , this kind of symptoms are observed when the unit in Turned on with the input supply, but important thing is it get disappears after sometime, so what i want to understand is, did this symptom was continuously displaying on the screen.

If the answer is Yes, then it is due to some event happened in the unit.

From the image shared, i could see Red Flag was pop-up in the HMI, it clearly determines that there could be some event in the unit.

Can you capture the fault event by pressing the Red flag,  i mean when you press the Red flag, it will take you to the next screen , where you can see the fault event . Please capture a small video or an similar kind of image and share it with us.

In addition, i recommend to download the Event log file from the HMI .

Event Log screen displays events that occurred.

Touch an event to select it.

Press the magnifying glass icon  to display the details for that event.

You can save the Event Log to a USB storage device.

Once it is connected, press this icon to save the file.

In addition to that, please collect the commercial reference , unit serial number and is the unit is standalone or connected in parallel.

Note: After collecting all the detail, i recommend you to raise a BFO case through your country "CCC" team, Customer Care Center. Here below attached the link in both English and Vietnamese

English

https://www.se.com/vn/en/work/support/customer-care/contact-schneider-electric.jsp

 

Vietnamese

https://www.se.com/vn/vi/work/support/customer-care/contact-schneider-electric.jsp

 

Regards

Arunprasad

See Answer In Context

Reply
Replies 3
Arunprasad
Lt. Commander Arunprasad Lt. Commander
Lt. Commander

Posted: ‎2023-05-09 11:36 AM

1 Like
2
2039
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2023-05-09 11:36 AM

Hello Tien Dat

"Control Board Initialization Progress…” means, it is try to reboot by itself , this kind of symptoms are observed when the unit in Turned on with the input supply, but important thing is it get disappears after sometime, so what i want to understand is, did this symptom was continuously displaying on the screen.

If the answer is Yes, then it is due to some event happened in the unit.

From the image shared, i could see Red Flag was pop-up in the HMI, it clearly determines that there could be some event in the unit.

Can you capture the fault event by pressing the Red flag,  i mean when you press the Red flag, it will take you to the next screen , where you can see the fault event . Please capture a small video or an similar kind of image and share it with us.

In addition, i recommend to download the Event log file from the HMI .

Event Log screen displays events that occurred.

Touch an event to select it.

Press the magnifying glass icon  to display the details for that event.

You can save the Event Log to a USB storage device.

Once it is connected, press this icon to save the file.

In addition to that, please collect the commercial reference , unit serial number and is the unit is standalone or connected in parallel.

Note: After collecting all the detail, i recommend you to raise a BFO case through your country "CCC" team, Customer Care Center. Here below attached the link in both English and Vietnamese

English

https://www.se.com/vn/en/work/support/customer-care/contact-schneider-electric.jsp

 

Vietnamese

https://www.se.com/vn/vi/work/support/customer-care/contact-schneider-electric.jsp

 

Regards

Arunprasad
Reply
tien_dat
Crewman tien_dat Crewman
Crewman

Posted: ‎2023-05-09 05:09 PM

0 Likes
1
2034
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2023-05-09 05:09 PM

Thanks, Arunprasad,

I send the nameplate of the product, event log, T&C file as an attached file. 

The active harmonic filter appears in this message only with unit status 1/4. After appearing this message, then PCS+ could not permit it to run.

We will send you a video about red flags as you guide later

Notes, the unis operates  in standalone mode

 

 

 

Attachments
Reply
Arunprasad
Lt. Commander Arunprasad Lt. Commander
Lt. Commander

Posted: ‎2023-05-10 12:05 AM

0 Likes
0
2021
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2023-05-10 12:05 AM

Hello Tien ,

As i mentioned above,

Press the Red flag and capture the Event that display in the HMI. 

Please raise a BFO Case in CCC, we don't use this forum to discuss  more in detail.

So again i request you to raise a case and add the details to the BFO Case.

Hope you can understand.

Regards

Arunprasad
Reply
Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of