Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Join our "Ask Me About" community webinar on May 20th at 9 AM CET and 5 PM CET to explore cybersecurity and monitoring for Data Center and edge IT. Learn about market trends, cutting-edge technologies, and best practices from industry experts.
Register and secure your Critical IT infrastructure

New firmware available for PowerLogic HDPM6000 with bunch of new updates !!!

Metering & Power Quality

Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • EcoStruxure Power & Grid
  • Metering & Power Quality
  • New firmware available for PowerLogic HDPM6000 with bunch of new updates !!!
Options
  • Subscribe to RSS Feed
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
Charles_Murison
Picard Charles_Murison Picard
477
Ramasamy_N
Captain Ramasamy_N Captain
113
Robert_Lee
Admiral Robert_Lee Admiral
92
Mehran_Mehrnia
Captain Mehran_Mehrnia Captain
85
View All
Related Products
product field
Schneider Electric
EcoStruxure™ Power Monitoring Expert

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to Metering & Power Quality
Solved
sesa205780_brid
Ensign sesa205780_brid Ensign
Ensign

Posted: ‎2021-01-22 01:17 PM

0 Likes
3
2134
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2021-01-22 01:17 PM

New firmware available for PowerLogic HDPM6000 with bunch of new updates !!!

HDPM6000 V.56 Firmware is now available with bunch of new updates, related to energy and power quality metering, improved performance and bug fixes.

 

                                                                                  Key updates

Energy Metering

  • kVAh (Apparent Energy) reporting by heads unit for main inputs.
  • Expansion of demand functionality
    • Real power demand (kW) available on mains connected to head unit + branch circuits
    • Peak real power demand (kW) (Daily and Historical) available on mains connected to head unit + branch circuits
    • Reactive power demand (kVAr) available for mains connected to head unit
    • Subintervals (rolling block demand) are now supported

 

Power quality metering

  • The power quality metrics available from the head unit expanded to include
    • Total Demand Distortion (TDD)
    • Voltage unbalance and
    • Current unbalance

 

Performance

  • Adaptive Speed has been added as an optional data collection mode. This mode calculates data (power, energy, etc.) at a one second interval on supported systems, while maintaining the default calculation interval (2 seconds) on all other systems.

 

Please refer to the release notes, for detailed list of updates

Updated Firmware (V.56) is available for download on se.com

 

Updated Technical data sheets and install guides (along with bunch of other assets are available on Exchange

  • Thumbnail of EcoStruxure™ Power Monitoring Expert
    Schneider Electric
    EcoStruxure™ Power Monitoring Expert
View products (1)
Labels
  • Labels:
  • PM Announcements
Tags (1)
  • Tags:
  • english
Reply
  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
Charles_Murison
Picard Charles_Murison Picard
Picard

Posted: ‎2021-01-25 09:30 AM

0 Likes
0
2131
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2021-01-25 09:30 AM

Thank you for sharing

 

Regards,

Charles

L4 Prime for Advanced metering and Utilities

See Answer In Context

Tags (1)
  • Tags:
  • english
Reply
Replies 3
Charles_Murison
Picard Charles_Murison Picard
Picard

Posted: ‎2021-01-25 09:30 AM

0 Likes
0
2132
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2021-01-25 09:30 AM

Thank you for sharing

 

Regards,

Charles

L4 Prime for Advanced metering and Utilities
Tags (1)
  • Tags:
  • english
Reply
ryan_bolwerk_fa
Lieutenant | EcoXpert Master ryan_bolwerk_fa Lieutenant | EcoXpert Master
Lieutenant | EcoXpert Master

Posted: ‎2021-02-25 08:22 AM

0 Likes
1
2120
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2021-02-25 08:22 AM

I'm not able to access the release notes. Can these be shared?

Tags (1)
  • Tags:
  • english
Reply
sesa205780_brid
Ensign sesa205780_brid Ensign
Ensign

Posted: ‎2021-02-25 09:08 AM

0 Likes
0
2115
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2021-02-25 09:08 AM

Hi Ryan,

 

Please try now. It should be accessible. Sorry for inconvenience,

 

https://schneider-electric.box.com/s/szvshyf3nt0pi102oi3dfg74x09ykuew

Tags (1)
  • Tags:
  • english
Reply
Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of