Detailed drawings for Varset / CB charactersitics
Here is a request I have received from Yorga Rohimmudin (SE Indonesia):
"Would you help us to provide complete Single Line Diagram and General Arrangement and Schematic of Varset?
it's specification is 600 kVAR, 400V, detuned at 190Hz. with CB.
Ref number VLVAF6P03522AA
Especially, for system design purpose, we really need to know what is the CB type that used in the Varset with ref number above. Please help us."
More generally: where can we get or find the detailed BOM for each Varset reference?
Thank you
- Labels:
-
Power Quality

Posted: 2015-12-30 11:56 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Email to a Friend
- Report Inappropriate Content
Link copied. Please paste this link to share this article on your social media post.
Hi,
I am not sure what they are trying to build, if they want to have a list of the main parts used on this specific Varset, they can get the spare parts list by contacting the Technical Support team. Through that channel they will be able to get a list of the main components. Not the entire BOM as I don't believe they need to know the connectors, cables, adapter and so many things used to build this equipment.
Fabricio
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Email to a Friend
- Report Inappropriate Content
Link copied. Please paste this link to share this article on your social media post.
Hi Thierry,
Single Line Diagram and General Arrangement and Schematic of Varset are available thru shopping kiosk.
Regarding spare parts detailed information must be requested to technical support team, today.
My intent is to be able to have this year, these detailed informations built and available at least thru shopping kiosk like other drawings,schematic and guides.
I will come back to you when this could be possible for implementation but in a context of low ressources and of low business impact of this action, this will not be taken as a priority
Franck