Case Study Neutral conductor and transformer overload issues
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2014-04-0304:03 PM
Case Study Neutral conductor and transformer overload issues
Goal
To better understand the impact of harmonics on the 600 V bus duct and 2500 KVA transformer.
Solution
Use PowerLogic meters combined with StruxureWare Power Monitoring Expert software to calculate the true capacity of the facility’s transformer. This information helps to solve problems with neutral overloads and transformer heating.
Results
• New bus duct purchased with a neutral ampacity of 100%.
• Temporarily shared harmonic loading between two transformers
• Avoided millions of dollars in damaged product and lost sales.