Welcome to the new Schneider Electric Community

It's your place to connect with experts and peers, get continuous support, and share knowledge.

  • Explore the new navigation for even easier access to your community.
  • Bookmark and use our new, easy-to-remember address (community.se.com).
  • Get ready for more content and an improved experience.

Contact SchneiderCommunity.Support@se.com if you have any questions.

Close
Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
84770members
354200posts

Case Study Loose connections cause power quality problems

Metering & Power Quality

Collaborate with multiple experts and discuss various topics about Power Meters and Power Quality. From design & implementation to troubleshooting and more, get support from experts and share your experiences by subscribing to the Schneider Electric Exchange forum today.

J_Meakins
Ensign Ensign
Ensign
0 Likes
0
285

Case Study Loose connections cause power quality problems

Goal

To eliminate loose connections in AC power systems, thus reducing voltage fluctuations that cause power quality problems and equipment damage.

Solution

PowerLogic meters provide plant engineers with the information they need to reduce downtime, ensure employee productivity, and reduce manufacturing costs.

Results

• Loose connection identified quickly

• Utility connection point de-energized and repaired

• Facility avoided power disruption

• No serious production delays

Attachments