New Community Ranking System
Our Community ranking system has recently been updated. You may notice changes in user rankings and receive system messages or notifications. If you have questions about how the new ranking works, please refer to the announcement post for more details (click here).
Can below feature be programmed in ION 7650 - "MD Integration Period is 15 Minutes with sub integration period of 5 minutes with sliding window method."
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Search in
Improve your search experience:
Exact phrase→Use quotes " "(e.g., "error 404")
Wildcard→Use * for partial words(e.g., build*, *tion)
AND / OR→Combine keywords(e.g., login AND error, login OR sign‑in)
Keep it short→Use 2–3 relevant words, not full sentences
Filters→Narrow results by section(Knowledge Base, Users, Products)
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
2015-09-0801:54 AM
Can below feature be programmed in ION 7650 - "MD Integration Period is 15 Minutes with sub integration period of 5 minutes with sliding window method."
MD Integration Period is 15 Minutes with sub integration period of 5 minutes with sliding window method. Is it possible to configure ION7650 for this feature?
Link copied. Please paste this link to share this article on your social media post.
2015-09-0804:10 PM
I assume MD is some type of Power Demand which to answer your question, yes you can modify the default demand period use to compute demand from the default of a single period of 15 minutes to 3 x 5 minute sub-intervals. ION Setup will do this fairly easily while using ION Designer is a bit more tedious.
Link copied. Please paste this link to share this article on your social media post.
2015-09-0804:10 PM
I assume MD is some type of Power Demand which to answer your question, yes you can modify the default demand period use to compute demand from the default of a single period of 15 minutes to 3 x 5 minute sub-intervals. ION Setup will do this fairly easily while using ION Designer is a bit more tedious.