Sustainability

Join our "Ask Me About" community webinar on May 20th at 9 AM CET and 5 PM CET to explore cybersecurity and monitoring for Data Center and edge IT. Learn about market trends, cutting-edge technologies, and best practices from industry experts.
Register and secure your Critical IT infrastructure

need help selecting UPS for pretty bad situation

APC UPS for Home and Office Forum

Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • APC UPS, Critical Power, Cooling and Racks
  • APC UPS for Home and Office Forum
  • need help selecting UPS for pretty bad situation
Options
  • Subscribe to RSS Feed
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
BillP
Administrator BillP Administrator
2151
Teken
Spock Teken
99
voidstar_apc
Janeway voidstar_apc
83
View All

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to APC UPS for Home and Office Forum
Solved
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

0 Likes
1
657
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

need help selecting UPS for pretty bad situation

I need something that can power a high-performance PC with a 650W power supply (of course I don't know what it will actually be using at any given time, but assuming the full performance it can) along with a WiFi router, a 19" CRT monitor, an external hard drive, and an external broadband modem for 2.5 to 3 hours.

I also need it to be compatible with 220 V (it will be used overseas where the power goes out 2-3x a day for at least 1.5-2+ hours each time), and with gas generators. I'm not sure what "generator-compatible" means when I see the specs on the main APC site. Do non-generator-compatible UPS(s) not work with generator power? (The generator's weak, can't really handle a draw over 600 W). Of course that's just to make life easy for me in case I can't get to the UPS in time to switch the power off before the generator comes on (although having to race against time every few hours might be exciting). How much wattage would a UPS (and I'm assuming some kind of extra or special battery?) for this application draw normally? How long would it take to recharge?

I'm trying to see whether going the cheap PC + expensive UPS route would be more cost effective than the expensive Laptop + cheap UPS route.

Thanks for any help.

Labels
  • Labels:
  • Back-UPS & Surge Protectors
Reply

Link copied. Please paste this link to share this article on your social media post.

  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
Anonymous user
Not applicable

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

0 Likes
0
659
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

This is a little tricky to size due to the number of factors invovled, but i'll see what I can come up with. First off will your equipment run on 230V? Most power supplies can be set for either 120 or 230,but some of your smaller equipment may not. If it needs to be a mix of the two, APC makes an auto sensing ups' that take both 120 and 230 in and output 120, if not you can just use an international ups.

As far as generator compatibility is concerned, you can lower the sensitivity on your ups to work with "dirtier" power that is normally output by a generator, but APC does recommend the generator be 3-5 times the size of load it supports. So this generator has trouble with a 600 watt load, it may not work with our ups.

As far as a ups that would work for these purposes, I would have to recommend either the sum1500xli with 3-4 sum48xlbps or the sua2200xli with 2-3 sua48xlbps. These ups can support up to 1400-1900 watt load and would give you 3-4 hours of runtime at one time. This would be a pretty expensive solution though, it would roughly be at least $2000-$3000. The ups would only be drawing additional power than what it used to power the load while it was recharging the batteries which isnt that much.

It normally takes 3 hours to recharge the ups internal batts, it would take atleast 10-20 hours to recharge the remaining battery packs. So there may be scenarios where you would have to completely turn off your equipment to let the unit fully recharge. Also a ups is really intended for extended use everyday so the typical 3-5 year battery life expectancy would reduce greatly as well. It would be more around 6 months to a year.

This is all based off of needing the ups to provide power for 4-6 hours a day, depending on the frequency of outages, duration of equipment use, and actual load on the ups, a smaller ups with less runtime may work for you. However I would recommend going with a more expensive laptop with some good batteries or a better generator if you can. Let me know if i can be of any further assistance.

See Answer In Context

Reply

Link copied. Please paste this link to share this article on your social media post.

Reply 1
Anonymous user
Not applicable

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

0 Likes
0
660
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 09:22 PM . Last Modified: ‎2024-03-26 12:31 AM

This is a little tricky to size due to the number of factors invovled, but i'll see what I can come up with. First off will your equipment run on 230V? Most power supplies can be set for either 120 or 230,but some of your smaller equipment may not. If it needs to be a mix of the two, APC makes an auto sensing ups' that take both 120 and 230 in and output 120, if not you can just use an international ups.

As far as generator compatibility is concerned, you can lower the sensitivity on your ups to work with "dirtier" power that is normally output by a generator, but APC does recommend the generator be 3-5 times the size of load it supports. So this generator has trouble with a 600 watt load, it may not work with our ups.

As far as a ups that would work for these purposes, I would have to recommend either the sum1500xli with 3-4 sum48xlbps or the sua2200xli with 2-3 sua48xlbps. These ups can support up to 1400-1900 watt load and would give you 3-4 hours of runtime at one time. This would be a pretty expensive solution though, it would roughly be at least $2000-$3000. The ups would only be drawing additional power than what it used to power the load while it was recharging the batteries which isnt that much.

It normally takes 3 hours to recharge the ups internal batts, it would take atleast 10-20 hours to recharge the remaining battery packs. So there may be scenarios where you would have to completely turn off your equipment to let the unit fully recharge. Also a ups is really intended for extended use everyday so the typical 3-5 year battery life expectancy would reduce greatly as well. It would be more around 6 months to a year.

This is all based off of needing the ups to provide power for 4-6 hours a day, depending on the frequency of outages, duration of equipment use, and actual load on the ups, a smaller ups with less runtime may work for you. However I would recommend going with a more expensive laptop with some good batteries or a better generator if you can. Let me know if i can be of any further assistance.

Reply

Link copied. Please paste this link to share this article on your social media post.

Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of