
Posted: 2021-07-06 08:26 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Email to a Friend
- Report Inappropriate Content
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-07-06 08:26 AM
UTS6H Coverage Expansion
Present situation is a UTS6H Panel with attached Back-UPS Pro 1500/BR24BPG External Battery Pack and standby eu3000is Inverter Generator, feeding six (of 42) lightly loaded (~5A total circuit load) Main Panel breakers.
Without replacing the UTS6H with a 10 circuit UTS, is it possible to expand the UTS6H's coverage by feeding more than six, lightly loaded Main Panel breakers?
In other words, is it possible to split a single UTS6H circuit and feed two lightly loaded (~5A total circuit load) Main Panel breakers?
Thanks.
#UTS6H
- Tags:
- english
Link copied. Please paste this link to share this article on your social media post.
