Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2907:08 PM. Last Modified: 2024-03-2103:13 AM
Run Time Calibration
A few questions:
After a new ups is installed should a run time calibration be ran to get the most accurate reading?
A run time calibration should be ran after new batteries are installed...correct?
Should a run time calibration be ran yearly?
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2907:08 PM. Last Modified: 2024-03-2103:13 AM
1.) Yes, once all your load is attached this is a good idea.
2.) Yes, you can do it at this time as well
3.) Yes and maybe if you change your load around a lot. I would not do it more than 1-2 times a year or after you change the batteries.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2907:08 PM. Last Modified: 2024-03-2103:13 AM
1.) Yes, once all your load is attached this is a good idea.
2.) Yes, you can do it at this time as well
3.) Yes and maybe if you change your load around a lot. I would not do it more than 1-2 times a year or after you change the batteries.