Welcome to the new Schneider Electric Community

It's your place to connect with experts and peers, get continuous support, and share knowledge.

  • Explore the new navigation for even easier access to your community.
  • Bookmark and use our new, easy-to-remember address (community.se.com).
  • Get ready for more content and an improved experience.

Contact SchneiderCommunity.Support@se.com if you have any questions.

Close
Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
84606members
353882posts

RS1000 configuration ?

APC UPS for Home and Office Forum

Schneider Electric support forum for our APC offers including Home Office UPS, Surge Protectors, UTS, software and services and associated products designed to share knowledge, installation, and configuration.

Solved
BillP
Administrator Administrator
Administrator
0 Likes
1
84

RS1000 configuration ?

This question was originally posted by Matt on APC forums on 12/21/2009


We have an RS1000 that we think is running a test cycle every 7 days. The problem is that the UPS is powering our switches for the network, and when it shuts down, even briefly, it causes the switches to go dumb and we lose connectivity.

Where can I find out how to check for configuration of the test cycle, or where can I find info on the default test cycle?


Accepted Solutions
BillP
Administrator Administrator
Administrator
0 Likes
0
84

Re: RS1000 configuration ?

This reply was originally posted by Jonathan on APC forums on 12/21/2009


Good day Matt,

Our UPS performs a self-test every 2 weeks from the time it was turned on or has ran a self-test. The Back-UPS product line is configured like this and there is no way to change the said period. Does the UPS drop/turn off the load during this cycle? Have you tried performing a self-test on the UPS without any load? By any chance do you have a spare battery for this UPS?

JonPro

See Answer In Context

1 Reply 1
BillP
Administrator Administrator
Administrator
0 Likes
0
85

Re: RS1000 configuration ?

This reply was originally posted by Jonathan on APC forums on 12/21/2009


Good day Matt,

Our UPS performs a self-test every 2 weeks from the time it was turned on or has ran a self-test. The Back-UPS product line is configured like this and there is no way to change the said period. Does the UPS drop/turn off the load during this cycle? Have you tried performing a self-test on the UPS without any load? By any chance do you have a spare battery for this UPS?

JonPro