Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!

2 Back-UPS on one PC - How to Select

APC UPS for Home and Office Forum

Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • APC UPS, Critical Power, Cooling and Racks
  • APC UPS for Home and Office Forum
  • 2 Back-UPS on one PC - How to Select
Options
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
BillP
Administrator BillP Administrator
2151
Teken
Spock Teken
101
voidstar_apc
Janeway voidstar_apc
83
View All

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to APC UPS for Home and Office Forum
Solved
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

0 Likes
1
519
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

2 Back-UPS on one PC - How to Select

Good day.

I have 2 Back-UPS units. Both are attached to my PC (Win 10-64) and I have PowerChute 3.2 installed. I realize that I can not have 2 sessions of PowerChute running, but can I select which Back-UPS that I am controlling?

BR1500G for my PC and peripherals. It works correctly and performs a shut-down at 5 min.

BR1000XS for my NAS. The BR1500 was getting too loaded with too short of a battery run time when I added a NAS.

The Back-UPS will not perform a shut down on the NAS and I am happy to let the NAS just shut-down when the battery is drained. It will run longer on the BR1000 than the PC on the BR1500. It is seldom that the line power is out for more than a few minutes but switching can take  a second or so and produces spikes.

Cal

Labels
  • Labels:
  • Back-UPS & Surge Protectors
Reply

Link copied. Please paste this link to share this article on your social media post.

  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

0 Likes
0
519
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

Hi,

I do not recommend having 2 Back-UPS connected to a single PC via USB when PowerChute Personal Edition is installed. 

If you need to make changes to the BR1000 configuration you should disconnect the USB cable from the BR1500 and connect to the BR1000. Make the needed configuration changes and then disconnect the 1000 and reconnect the 1500. Leaving both Back-UPS connected could cause unexpected connection issue upon reboot of the PC.

See Answer In Context

Reply

Link copied. Please paste this link to share this article on your social media post.

Reply 1
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

0 Likes
0
520
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-28 07:15 AM . Last Modified: ‎2024-03-26 10:38 PM

Hi,

I do not recommend having 2 Back-UPS connected to a single PC via USB when PowerChute Personal Edition is installed. 

If you need to make changes to the BR1000 configuration you should disconnect the USB cable from the BR1500 and connect to the BR1000. Make the needed configuration changes and then disconnect the 1000 and reconnect the 1500. Leaving both Back-UPS connected could cause unexpected connection issue upon reboot of the PC.

Reply

Link copied. Please paste this link to share this article on your social media post.

Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of