SmartUPS SUA1500i Runtime Calibration after a battery change
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-3003:08 AM. Last Modified: 2024-03-0804:55 AM
SmartUPS SUA1500i Runtime Calibration after a battery change
Hello All,
I am using SmartUPS SUA1500i with network management card 9617 connected to the network. It was running with stock APC 12V 7AH internal batteries which went dry recently.
I have now hooked up two new LEOCH 12V 38AH external batteries to it, using the power connecter extender cable. Have changed the last battery change date in the web interface of UPS. I need to know
1. Is it necessary for me to run time calibrate the UPS after this battery change.
2. What is the correct procedure to execute this run time calibration. Is there any difference in "Manual Runtime Calibration" and the calibration option executed from the web interface.
3. Does UPS needs to be connected to A/C power main during the runtime calibration, or does the A/C mains needs to be disconnected.
4. Would it really affect or improve the runtime.
5. Is there any thing else necessary to be performed after a battery change (like self test or brain dead).