Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
Set battery install date
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: ‎2025-06-0110:20 PM
Set battery install date
Hello,
I have an SMT750IC, connected via cable to the APC cloud ( website). How i can set the battery install date after replacement directly from the web interface or from the front device menu.
Link copied. Please paste this link to share this article on your social media post.
Posted: ‎2025-06-0205:40 AM
You may update the battery installation date if the system is connected to a computer running Power Chute Software (PCSS / PCBE).
Another option is to disconnect the battery connector and wait for the system to declare a battery fault.
Wait another ten seconds than reconnect the battery cable.
The system will prompt you to confirm if this is a new battery cartridge toggle from No to Yes. Enter the month & year and select enter.
Follow up by manually initiating a Self Test and let pass and allow the battery to recover to 100% SOC.
Complete the process by manually initiation a Battery Calibration with at least 30% attached load. Allow the procedure to complete and battery return to 100% SOC.
The above procedure will insure the operational runtime is displayed and seen is accurate as possible.