Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-07-0104:39 AM. Last Modified: 2024-03-0502:02 AM
When you run a Runtime Calibration you are calibrating the load the available battery/s. The runtime calibration results are posted to the available runtime. Below is a screenshot from a Smart-UPS 700 that shows the runtime at 6 minutes. If I run a Runtime Calibration if there is a change it would be posted here.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-07-0104:39 AM. Last Modified: 2024-03-0502:02 AM
When you run a Runtime Calibration you are calibrating the load the available battery/s. The runtime calibration results are posted to the available runtime. Below is a screenshot from a Smart-UPS 700 that shows the runtime at 6 minutes. If I run a Runtime Calibration if there is a change it would be posted here.