Rewiring Circuit to Generator Panel can you pull plug for 30 seconds max
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2810:23 PM. Last Modified: 2024-03-1404:34 AM
Rewiring Circuit to Generator Panel can you pull plug for 30 seconds max
We are having a generator installed and going to have to flip the current circuit over to the auto transfer switch. Luckily we also have to get another outlet ran to the transfer switch. Im hearing conflicting reports if I can pull the plug of a UPS and put it into another outlet without my servers losing power. Can it be done?