We Value Your Feedback!
Could you please spare a few minutes to share your thoughts on
Cloud Connected vs On-Premise Services. Your feedback can
help us shape the future of services. Learn more about the survey
or
Click here to Launch the survey Schneider Electric Services Innovation Team!
Powerchute with stretched metro cluster
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-04-3011:46 AM. Last Modified: 2025-04-3011:59 PM
Powerchute with stretched metro cluster
We have two datacenters in the same site with a stretched vmware cluster (4 hosts on each site) setup and with metrovolumes (synchronised storage volumes).
We configured the vm migration migration option with custom targets. DC1 to DC2 and DC2 to DC1 hosts.
What will happen when there is a power outage in both datacenters at the same site? This can happen since both datacenters are at the same site.
I would expect that when no more migration is possible because all hosts are getting in maintenance mode that the VM’s will be shutdown?