Ask our Experts
Didn't find what you are looking for? Ask our experts!
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Search in
Free
EnglishStrengthen your foundational knowledge in Data Centers for free, enroll in this path today and start your learning journey!
Posted: 2021-06-29 12:19 AM . Last Modified: 2024-03-14 12:52 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 12:19 AM . Last Modified: 2024-03-14 12:52 AM
Hi All
I have a SUA5000 smart-UPS with a AP9617 card, powering 5 servers, communicating with the UPS through a private network hub. All servers are set up as clients in the UPS's Powerchute, communication is fine.
I need the UPS to signal shutdown to all my servers with one of of these 3 events, whichever comes first:
* On battery for 20 minutes
* have 10 minutes left on runtime
* having 10% battery capacity left.
Going through all settings on the UPS, I don't seem to be able to have all that info into the configuration.
Thanks
PS: For clients, I use pcns for windows and mac servers, apcupsd for unix servers (they are much simpler), if this information is of any relevance
Message was edited by: thudn
Message was edited by: thudn
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 12:20 AM . Last Modified: 2024-03-14 12:52 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 12:20 AM . Last Modified: 2024-03-14 12:52 AM
Hi All
I have a SUA5000 smart-UPS with a AP9617 card, powering 5 servers, communicating with the UPS through a private network hub. All servers are set up as clients in the UPS's Powerchute, communication is fine.
I need the UPS to signal shutdown to all my servers with one of of these 3 events, whichever comes first:
* On battery for 20 minutes
* have 10 minutes left on runtime
* having 10% battery capacity left.
Going through all settings on the UPS, I don't seem to be able to have all that info into the configuration.
Thanks
PS: For clients, I use pcns for windows and mac servers, apcupsd for unix servers (they are much simpler), if this information is of any relevance
Message was edited by: thudn
Message was edited by: thudn
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 12:20 AM . Last Modified: 2024-03-14 12:52 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 12:20 AM . Last Modified: 2024-03-14 12:52 AM
Hi All
I have a SUA5000 smart-UPS with a AP9617 card, powering 5 servers, communicating with the UPS through a private network hub. All servers are set up as clients in the UPS's Powerchute, communication is fine.
I need the UPS to signal shutdown to all my servers with one of of these 3 events, whichever comes first:
* On battery for 20 minutes
* have 10 minutes left on runtime
* having 10% battery capacity left.
Going through all settings on the UPS, I don't seem to be able to have all that info into the configuration.
Thanks
PS: For clients, I use pcns for windows and mac servers, apcupsd for unix servers (they are much simpler), if this information is of any relevance
Message was edited by: thudn
Message was edited by: thudn
Link copied. Please paste this link to share this article on your social media post.
You’ve reached the end of your document
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.