Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2803:29 AM. Last Modified: 2024-03-1804:37 AM
MGE galaxy 5000 250 KVA installation
Please help for installing 250kva MGE galaxy 5000 UPS . Physical jobs all finished . In/out termination , battery all finished . Please advice for the rest. battery
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2803:30 AM. Last Modified: 2024-03-1804:37 AM
Hi,
You need to contact local 3 phase technical support for assistance with this. There are many variables that can affect the start up and running of a 3 phase UPS and local support and local field service personal are qualified to assists you.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2803:30 AM. Last Modified: 2024-03-1804:37 AM
Hi,
You need to contact local 3 phase technical support for assistance with this. There are many variables that can affect the start up and running of a 3 phase UPS and local support and local field service personal are qualified to assists you.