Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
Learning how to suggest the UPS size for particular load for Battery Backup
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2605:44 AM. Last Modified: 2024-03-1912:35 AM
Learning how to suggest the UPS size for particular load for Battery Backup
I want to learn how to design the UPS, from start to end. How to calculate load? (This i have idea) What are the important things while calculation load for UPS? (Also some idea) How to suggest the size of UPS? How battery backup time works for the UPS? Like if for 50 servers i have to design UPS so load is suppose 50*220*15=110,000Watts = 110KW, converting in to KVA Considering P.F ok....but how to calculate battery backup time for above load for 1hour for full load, size if 30mints for full load, size if 30mints for half load? size if 15 mints full load? size if 15mints 20% load? i want to clear my concepts................Please if anyone can help me.