Configure PCNS 4.2 to enable ESXi up for 1 hour in battery mode.
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2910:42 PM. Last Modified: 2024-03-1201:11 AM
Configure PCNS 4.2 to enable ESXi up for 1 hour in battery mode.
Hi support,
Good day. I've APC Smart UPS 2200 installed in office, with 2 ESXi hosts connected through NMC, now the connection between UPS and both ESXi hosts are established perfectly.
But I'm not really sure on configuring startup / shutdown rules for it.
1) As per checked in PCNS configuration page https://:6547 "Virtualization Settings", I can see the settings for "Virtual Machine Startup / shutdown" and "vCenter Server VM shutdown", but I'm not really sure how does it work and how to configure it. Can you please explain it briefly?
2) Let's say there is power outage and the UPS need to run in battery mode, is it possible to configure the UPS to run on battery mode for 1 hour, then followed by gracefully shutdown all my VM ?