Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-01-2111:38 AM
APC PRO1000/ BR1000G BATTERY REPLACEMENT
I have looked at over 12 videos and not one talks about the beginning process of do you have to disconnect the connected items??, pull the power plug BEFORE changing the battery?? Also is this a pull out and replace model? do you have to disconnect and reconnect wires or is this model a pull out and put in swap model??
like to know this stuff before I get into it? frustrated!