Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
Energy Cost Report
Working with reports
Search in
Improve your search experience:
Exact phrase→Use quotes " "(e.g., "error 404")
Wildcard→Use * for partial words(e.g., build*, *tion)
AND / OR→Combine keywords(e.g., login AND error, login OR sign‑in)
Keep it short→Use 2–3 relevant words, not full sentences
Filters→Narrow results by section(Knowledge Base, Users, Products)
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
An Energy Cost report can be generated to calculate the costs for running specified equipment used for charge back and efficient budgeting.
The report will include data based on
The filter selections
Time period
Rooms
Tags*
The entered kWh price
The entered overhead factor
102240469_360038495753.png
The system uses the best available data for the calculations.
Measured load values: These values are used if the IT devices have been set up to report live measured data from an external monitoring system such as Data Center Expert server.
Estimated load values from saved KPI data: These values are used if there is no measured data available and the system has been set up to save KPI data (Capacity History preferences). The saved KPI estimated load values result in a more accurate report than if only the present time estimated load is available. It allows for using the estimated load throughout the specified time period.
Present time estimated load values: These values are used if there is no measured data or KPI data available in the system, or if the manufacturer's nameplate value is all that is available to the system, this is the value that will be used. The manufacturer's nameplate values are based purely on the manufacturer's nameplate of the specified equipment without taking any power loss into account. The overhead factor can be used to adjust the costs to real world power usage effectiveness (PUE). Any changes done during the specified time period will not be reflected in the report, which makes the report less accurate. For example, if you remove a piece of equipment in between the start and end date, its estimated load value will be completely left out of the calculations. If you add a piece of equipment in between the start and end date, its estimated load value will be included in the calculations as if it was in the solution throughout the entire time period.
For information about the energy efficiency concepts, such as Power Usage Effectiveness (PUE), go to: the Green Grid and read the White Papers.
WP-157: Selecting an Industry-Standard Metric for Data Center Efficiency
WP-154: Electrical Efficiency Measurement for Data Centers
WP-114: Implementing Energy Efficient Data Centers
WP-113: Electrical Efficiency Modeling for Data Centers
*Tags included in this report are tags on racks. If you include a piece of tagged rack-mounted equipment and select to include this tag in the report, it will not be included in the report calculation. Only if the rack that the piece of equipment is positioned in is tagged and selected for the report, it will be included.