Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Use the controlled automated work order process to propose changes to the non-power, rack-mountable equipment included in the racks for existing rooms (drag and drop).
Any changes proposed to the data center model will appear color coded and with symbols added to the equipment icons until the changes saved. After you have saved and closed the Work Order Editor, you can accept or reject the changes by right-clicking the equipment icon and selecting Cancel Planned Change or Execute Planned Change.
Note
You cannot delete or reposition a rack PDU or rack-mounted UPS when you are working in the controlled work order process as these are critical to the power connection setup for a server room. Instead, you can do changes of this kind when the Work Order Editor is closed.