Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
Power Quality Meter
Metering & Power Quality
Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Need to understand the details behind the question to be able to answer correctly. Are you asking if the PM8000 meter can monitor two separate 3 circuit systems as individual systems, then answer is no. If you are asking if PM8000 can have a CTs from 2 sources landed to one input, then answer is it depends. Have a look at https://www.se.com/ca/en/faqs/FA202846/.
If these do not answer your question please consider including a diagram to explain what you are after.