EcoStruxure IT forum
Schneider Electric support forum about installation and configuration for DCIM including EcoStruxure IT Expert, IT Advisor, Data Center Expert, and NetBotz
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 11:18 PM . Last Modified: 2024-04-05 04:58 AM
I'm trying to configure Energy Efficiency and I'd like to know what means the errors showed when try to evaluate the Energy System. I found two different errors:
"Invalid configuration for subsystem Critical Power Distribution"
"Critical power distribution must be present, measured and connected to UPS or Switchgear"
Best regards,
Enric Climent
(CID:124527337)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 11:18 PM . Last Modified: 2024-04-05 04:58 AM
Dear Enric,
The system needs a minimum energy system configuration to provide you with a calculated PUE/DCiE value. An energy system must at least include:
The below post which describes the tips for configuring Energy Efficiency.
https://dcimsupport.apc.com/questions/105464925/tips-for-configuring-energy-efficiency-
https://dcimsupport.apc.com/display/public/UADCO8x/Energy+system+configuration
BR,
Rana
(CID:124527381)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 11:18 PM . Last Modified: 2023-10-22 04:27 AM
This question is closed for comments. You're welcome to start a new topic if you have further comments on this issue.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.