EcoStruxure IT forum
Schneider Electric support forum about installation and configuration for DCIM including EcoStruxure IT Expert, IT Advisor, Data Center Expert, and NetBotz
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 05:47 PM . Last Modified: 2024-04-08 12:05 AM
Hi,
Does anyone know if its possible to connect a whole racks worth of devices to a PDU without going through and individually changing each device?
Thanks
(CID:122688520)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 05:47 PM . Last Modified: 2024-04-08 12:05 AM
Hi Mark
If this is a once off task and the assets already exist in the rack, I believe this is not possible.
If the assets don't yet exist in the rack (or you can easily delete them if they do and re-add them) and your genomes are properly configured, placing the assets in the rack should auto connect them if you have this option enabled.
If you have to repeat this task many times over, then I suggest investigating the powerpath API.
POST /powerpath/cablesA powercable will be created between the rack mount Pdu and the asset. The cable will be connected to the rack mount Pdu on the specified phase(s)
I've not tried this myself but it looks promising.
Cheers
Ed
(CID:122688544)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 05:47 PM . Last Modified: 2023-10-22 03:35 AM
This question is closed for comments. You're welcome to start a new topic if you have further comments on this issue.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.