Welcome to the new Schneider Electric Community

It's your place to connect with experts and peers, get continuous support, and share knowledge.

  • You may be familiar with Communities' brand new layout from SE.com.
  • Don't forget to update your bookmarks and saved links with our new address (https://community.se.com/).
  • If you encounter any issues, please contact SchneiderCommunity.Support@se.com.
Close
Sign In Help
Important Announcement: WELCOME to the Schneider Electric Community! We have moved to a new address: community.se.com — bookmark it today and contact SchneiderCommunity.Support@se.com if you have any questions!
Schneider Electric
Help
Ask the Community Community Guidelines Community User Guide How-To & Best Practices Contact Support
Login / Register
Community Menu
  • Community Home
  • Forums
    • By Topic
        • Support
          • Ask the Community
        • EcoStruxure Building
          • SmartConnector Forum
          • Field Devices Forum
        • EcoStruxure Power & Grid
          • EcoStruxure Energy Hub User Group
          • Gateways and Energy Servers
          • Metering & Power Quality
        • APC UPS, Critical Power, Cooling and Racks
          • APC UPS Data Center & Enterprise Solutions Forum
          • APC UPS for Home and Office Forum
        • EcoStruxure IT
          • EcoStruxure IT forum
        • Remote Operations
          • EcoStruxure Geo SCADA Expert Forum
          • Remote Operations Forum
        • Industrial Automation
          • Industry Automation and Control Forum
          • Industrial Edge Computing Forum
          • Alliance System Integrators Forum
          • Machine Automation Forum
          • EcoStruxure Automation Expert / IEC 61499 Forum
          • AVEVA Plant SCADA Forum
          • Modicon PAC Forum
          • Harmony Control Customization Forum
          • Level and Pressure Instrumentation Forum
          • PLC Club Indonesia
          • Fabrika ve Makina Otomasyonu Çözümleri
          • Motorabgangstechnik & Antriebstechnik Forum
          • Korea Industrial Automation Forum
        • Schneider Electric Wiser
          • Schneider Electric Wiser Forum
        • Power Distribution IEC
          • Power Distribution and Digital
          • Solutions for Motor Management
          • Paneelbouw & Energie Distributie
          • Eldistribution & Fastighetsautomation
          • Elektrik Tasarım Dağıtım ve Uygulama Çözümleri
          • Електропроектанти България
          • Specifiers Club ZA Forum
        • Power Distribution NEMA
          • Power Monitoring and Energy Automation NAM
        • Power Distribution Software
          • EcoStruxure Power Design Forum
          • LayoutFAST User Group Forum
        • Solutions for your Business
          • Solutions for your Business Forum
      • Support
        • Ask the Community
      • EcoStruxure Building
        • SmartConnector Forum
        • Field Devices Forum
      • EcoStruxure Power & Grid
        • EcoStruxure Energy Hub User Group
        • Gateways and Energy Servers
        • Metering & Power Quality
      • APC UPS, Critical Power, Cooling and Racks
        • APC UPS Data Center & Enterprise Solutions Forum
        • APC UPS for Home and Office Forum
      • EcoStruxure IT
        • EcoStruxure IT forum
      • Remote Operations
        • EcoStruxure Geo SCADA Expert Forum
        • Remote Operations Forum
      • Industrial Automation
        • Industry Automation and Control Forum
        • Industrial Edge Computing Forum
        • Alliance System Integrators Forum
        • Machine Automation Forum
        • EcoStruxure Automation Expert / IEC 61499 Forum
        • AVEVA Plant SCADA Forum
        • Modicon PAC Forum
        • Harmony Control Customization Forum
        • Level and Pressure Instrumentation Forum
        • PLC Club Indonesia
        • Fabrika ve Makina Otomasyonu Çözümleri
        • Motorabgangstechnik & Antriebstechnik Forum
        • Korea Industrial Automation Forum
      • Schneider Electric Wiser
        • Schneider Electric Wiser Forum
      • Power Distribution IEC
        • Power Distribution and Digital
        • Solutions for Motor Management
        • Paneelbouw & Energie Distributie
        • Eldistribution & Fastighetsautomation
        • Elektrik Tasarım Dağıtım ve Uygulama Çözümleri
        • Електропроектанти България
        • Specifiers Club ZA Forum
      • Power Distribution NEMA
        • Power Monitoring and Energy Automation NAM
      • Power Distribution Software
        • EcoStruxure Power Design Forum
        • LayoutFAST User Group Forum
      • Solutions for your Business
        • Solutions for your Business Forum
      • Food & Beverage
      • Healthcare
  • Knowledge Center
    • Building Automation Knowledge Base
    • Geo SCADA Knowledge Base
    • Industrial Automation How-to videos
    • Digital E-books
    • Success Stories Corner
  • Success Stories
  • Events & Webinars
    • All Events
    • Innovation Talks
    • Innovation Summit
    • Let's Exchange Series
    • Technology Partners
    • Power Events & Webinars 
    • Partner Success
    • Process Automation Talks 
  • Ideas
        • Remote Operations
          • EcoStruxure Geo SCADA Expert Ideas
          • Remote Operations Devices Ideas
        • Industrial Automation
          • Modicon Ideas & new features
  • Blogs
    • By Topic
        • EcoStruxure Power & Grid
          • Backstage Access Resources
        • Remote Operations
          • Remote Operations Blog
        • Industrial Automation
          • Industry 4.0 Blog
          • Industrie du Futur France
        • Power Distribution NEMA
          • NEMA Power Foundations Blog
        • Knowledge Center
          • Geo SCADA Knowledge Base
          • Industrial Automation How-to videos
          • Digital E-books
          • Success Stories Corner
      • EcoStruxure Power & Grid
        • Backstage Access Resources
      • Remote Operations
        • Remote Operations Blog
      • Industrial Automation
        • Industry 4.0 Blog
        • Industrie du Futur France
      • Power Distribution NEMA
        • NEMA Power Foundations Blog
      • Knowledge Center
        • Geo SCADA Knowledge Base
        • Industrial Automation How-to videos
        • Digital E-books
        • Success Stories Corner
Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
  • Communities
  • :
  • Knowledge Center
  • :
  • Building Automation Knowledge Base
  • :
  • What is the replacement for a Drayton Theta YBL1 Valve Body / Actuator assembly?
How can we help?
cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
82702members
350440posts

What is the replacement for a Drayton Theta YBL1 Valve Body / Actuator assembly?

Back to Building Automation Knowledge Base
Options
  • Article History
  • Bookmark
  • Subscribe
  • Email to a Friend
  • Printer Friendly Page
  • Report Inappropriate Content
0 Likes
1539 Views
Trying to translate this page to your language?
Select your language from the translate dropdown in the upper right. arrow
Translate to: English
  • (Français) French
  • (Deutsche) German
  • (Italiano) Italian
  • (Português) Portuguese
  • (Русский) Russian
  • (Español) Spanish
Share

What is the replacement for a Drayton Theta YBL1 Valve Body / Actuator assembly?

Picard Product_Support
‎2018-09-10 12:13 AM

Last Updated: Administrator CraigEl Administrator Thursday

Issue

The Drayton Theta YBL1 Valve Body / Actuator assembly is to be replaced.

Environment

  • Replacement
  • Drayton
  • Actuator
  • Valve
  • YBL1

Cause

The Drayton Theta YBL1 Valve Body / Actuator assembly is obsolete.

Resolution

OVERVIEW

The Drayton Theta YBL1 Valve Body / Actuator assembly is obsolete, and there is no purpose built replacement.

The Valve Body was available in 1.1/4", 1.1/2" and 2" B.S.P. sizes and was normally installed as a mixing valve in variable temperature, constant volume, compensated heating circuits.

No Valve Body / Actuator assemblies are currently available in these sizes.

Details of the YB Valve Body may be viewed here.

 

VALVE BODY REPLACEMENT

To replace the YBL1 Valve Body the following is required:-

S-E SatchwellMB Valve Body of appropriate size - MB1552 (1.1/4"), MB1602 (1.1/2"), MB1652 (2")

Details of the MB Valve Body may be viewed here.

 

ACTUATOR REPLACEMENT (6-WIRE INSTALLATION)

The YBL1 Actuator normally comprised a 6-wire electrical connection enabling it to be operated by a Theta Potentiometric Controller as follows :- 

Terminal M1 – Open signal

Terminal M2 – Close signal

Terminal M3 – Common 

Terminal M4 – 135 ohm Feedback Potentiometer – winding

Terminal M5 – 135 ohm Feedback Potentiometer – wiper

Terminal M6 – 135 ohm Feedback Potentiometer – winding

Where 6 wires are connected to the YBL1 Actuator then the Actuator may be replaced by one or other of the following S-E Actuators :-

MD10B-24

MD20B-24 (if MD10B-24 not available)

Details of the MD10B-24 Actuator may be viewed here.

Details of the MD20B-24 Actuator may be viewed here.

 

LINKAGE KIT

A Linkage Kit will also be required in order to enable the MD Actuator to be mounted on the MB Valve Body.

Linkage Kit LMD/AR-MB (914-1071-000)

Details of the LMD/AR-MB Linkage Kit may be viewed here

 

IMPORTANT NOTE

In such 6-wire installations not only will the YBL1 Valve / Actuator assembly need to be replaced but the associated Theta Potentiometric Controller and its Sensors will also need to be replaced.

 

CONTROLLER REPLACEMENT

The Theta Potentiometric Controller may be replaced by the S-E Satchwell CSC5252 or the CSC5352 Compensator Controller.

Details of the CSC Controllers may be viewed here.

 

SENSOR REPLACEMENT

Theta 3-wire Temperature Sensors may be replaced by S-E Satchwell 2-wire Temperature Sensors compatible with the S-E Satchwell CSC 5252 or CSC5352 Compensator Controllers selected from the following as appropriate.

Outside Air Temperature Sensor (STO 600)

Contact Temperature Sensor (STC 600), or alternatively :-

Immersion Temperature Sensor (STP 660) + Sensor Pocket Adaptor (DWA 0001)

Room Temperature Sensor (STR 600) – OPTIONAL ONLY

Details of the STO 600 Outside Air Temperature Sensor may be viewed here.

Details of the STC 600 Contact Temperature Sensor may be viewed here.

Details of the STP 660 Water Temperature Sensor may be viewed here.

Details of the DWA 0001 Sensor Pocket Adaptor may be viewed here.

Details of the STR 600 Room Temperature Sensor may be viewed here.

 

N.B.

ACTUATOR REPLACEMENT (3-WIRE INSTALLATION)

Should only 3 wires be connected to a YBL1 Actuator then the Actuator may be replaced by one or other of the following S-E Actuators :-

MD10B-24

MD20B-24 (if MD10B-24 not available)

Details of the MD10B-24 Actuator may be viewed here.

Details of the MD20B-24 Actuator may be viewed here.

 

LINKAGE KIT

A Linkage Kit will also be required in order to enable the MD Actuator to be mounted on the MB Valve Body.

Linkage Kit LMD/AR-MB (914-1071-000)

Details of the LMD/AR-MB Linkage Kit may be viewed here

In such 3-wire installations the YBL1 Valve / Actuator assembly only will need to be replaced, while any associated Controller and Sensors may be retained.

Labels (1)
Labels:
  • Field Devices
Attachments
Tags (1)
  • Find more articles tagged with:
  • 5446
Was this article helpful? Yes No
100% helpful (1/1)
Share

Related Forums

  • Field Devices Forum
Previous Next
Contributors
  • Product_Support
    Product_Support
  • CraigEl
    CraigEl
Invite a Colleague
Found this content useful? Share it with a Colleague!
Invite a Colleague

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practices
  • Experts Leaderboard
  • Contact Support
 
  • twitter
  • facebook
  • linkedin
  • youtube
  • blog
  • instagram
Subscribing is a smart move!
You can subscribe to this forum after you log in or create your free account..

Create your free account or log in to subscribe to the forum - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account?Login

Privacy Notice Terms of Use Customize Preferences
© 2022, Schneider Electric