Issue
What can the Boost relay (R2) be used for?
Environment
Boost
Termination
Day control
Relay R2
Cause
The plant continues to operate even when the temperature is greater than the Td setting.
Resolution
The SVT Optimiser has a primary function of performing and optimised timed start, this is achieved using a space temperature sensor to provide an indication of the buildings internal temperature
The controllers secondary function will allow a "Boost Function" or "Day Control" of the plant. The controller output relay R2 is used for this function.
Boost Function.
Relay R2 contacts 5 - 4 make at the end of occupancy, ready for boost period.
Relay R2 contacts 5 - 3 make at Occupancy start and provides a termination of the Boost period.
For Boost Operation set the slide switch to position "A" as shown below.
Day control.
Relay R2 contacts 5 - 4 make when the space temperature is above the (Td) setting.
Relay R2 contacts 5 - 3 make when the space temperature is below the (Td) setting.
To review the complete SVT data sheet, please chick HERE.