A support forum for AVEVA Plant SCADA (formerly Citect SCADA). Share new and exciting product information, connect, learn, and collaborate with the ecosystem of Plant SCADA Users. AVEVA Plant SCADA a reliable, flexible and high-performance Supervisory Control and Data Acquisition software solution for industrial process customers. This forum is to connect, share, learn and collaborate new and exciting product information. Feel free to join and share to your Ecosystem of Plant SCADA Users.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-10-01 10:03 PM . Last Modified: 2024-10-01 10:11 PM
Hello,
I have a Scada configuration with:
1 Scada Engineering Station as the Proyect Deployment server
2 Scada Operator Station as proyect deployment clients
2 Scada Servers (Primary and Standby) as proyect deployment clients
Proyect Deployment was OK in earliest times, but now is taking a lot of time (~ 1 Hour)
Any idea about this issue?
Thanks in advance
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-10-02 10:09 PM
Hi @MAJLGC,
The coming October 2024 patch will have the following fix in it (plan is to release it on 8th October):
Deployment
The deployment server configuration and its operation were slow when a client used a domain controller and both the client and domain controller were not connected to the internet. The Configurator will now launch quickly under these circumstances, and the deployment server configuration and deployment operations will respond promptly.
If you require a fix before this date, I'd recommend reaching out to AVEVA Technical Support, who can guide you to implement a work around.
Kind regards
Olivier
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-10-02 10:09 PM
Hi @MAJLGC,
The coming October 2024 patch will have the following fix in it (plan is to release it on 8th October):
Deployment
The deployment server configuration and its operation were slow when a client used a domain controller and both the client and domain controller were not connected to the internet. The Configurator will now launch quickly under these circumstances, and the deployment server configuration and deployment operations will respond promptly.
If you require a fix before this date, I'd recommend reaching out to AVEVA Technical Support, who can guide you to implement a work around.
Kind regards
Olivier
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-10-08 02:35 PM
Hi @MAJLGC,
The October 2024 Patch is now available for download from the GCS AVEVA website.
Kind regards