Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!
APC UPS for Home and Office Forum
Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
HI
Regarding Model :
BR900GI
when turning ON the BR900GI after being in OFF position for 30 days , Do I need to adjust again the prefrences ? Or thay be save ?
(I'm leaving my home for a 30 days tour. I don't want to leave the UPS ON ...)
Thanks.
Ronen
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
Hi,
As long as the UPS stays plugged in during the time period all of the settings will remain the same. If the UPS were turned off and unattached from the AC source there is a possibility that the settings could be lost.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
Hi,
As long as the UPS stays plugged in during the time period all of the settings will remain the same. If the UPS were turned off and unattached from the AC source there is a possibility that the settings could be lost.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 09:36 PM . Last Modified: 2024-03-20 04:02 AM
Thanks !
So I need another UPS to connect to "MY" UPS to keep it "connected"
Thanks again , very appreciated !
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of