Important Announcement: WELCOME to the new Schneider Electric Community! Community is now no longer part of Exchange, and is now rebranded under se.com. If you have any bookmarks and links saved, we request you to update them to ensure that you continue accessing our community from this new location. For any issues that you might encounter as part of this change, please reach out to SchneiderCommunity.Support@se.com, and the team will help to get your issues resolved.
Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
82286members
349832posts

APC BACKUPS ES 650 IN - Issue with the power output

APC UPS for Home and Office Forum

Schneider Electric support forum for our APC offers including Home Office UPS, Surge Protectors, UTS, software and services and associated products designed to share knowledge, installation, and configuration.

Solved
happy_apc
Cadet
0 Likes
1
90

APC BACKUPS ES 650 IN - Issue with the power output

This was originally posted on APC forums on 8/14/2013


I have a APC back UPS 650 IN working perfectly since last week.

Last sunday when I am working on the desktop, it shutdown suddenly without any notifications or alarms.

Now.

1. When I switched on the UPS with the mains ON , it's LED indication shows green for a moment than turns to amber flashing with  no power output.

2. If I switched on the UPS without mains ON (no cord connected to main power), UPS switched on with green LED indication and proper power output.

3. POWERCHUTE doesn't shows any abnormalities with the UPS however unable to run the self test by the application , getting error"unable to finish the self test, please try later"

Could someone please advise what the issue with the UPS and sugeestions.

Thanks

Happy


Accepted Solutions
BillP
Administrator Administrator
Administrator
0 Likes
0
90

Re: APC BACKUPS ES 650 IN - Issue with the power output

This reply was originally posted by Secret on APC forums on 8/14/2013


Hello Happy,

A flashing Amber LED is only present on the UPS while performing a Selftest of the internal battery. The fact that you are also receiving a message in the PCPE software"unable to finish the self test, please try later" would lead me to believe their may be an actual issue with the UPS's Inverter curcuit or the unit's firmware. I would recommend you contact your local Schneider Electric call center for continued support.

SecretSquirrel

See Answer In Context

1 Reply 1
BillP
Administrator Administrator
Administrator
0 Likes
0
91

Re: APC BACKUPS ES 650 IN - Issue with the power output

This reply was originally posted by Secret on APC forums on 8/14/2013


Hello Happy,

A flashing Amber LED is only present on the UPS while performing a Selftest of the internal battery. The fact that you are also receiving a message in the PCPE software"unable to finish the self test, please try later" would lead me to believe their may be an actual issue with the UPS's Inverter curcuit or the unit's firmware. I would recommend you contact your local Schneider Electric call center for continued support.

SecretSquirrel