Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
transformer question
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2808:33 PM. Last Modified: 2024-03-1501:35 AM
transformer question
This is my situation. I have a collo and in my cage there is spare dual 208V/30A circuit with L6-30 type plug. Usually, I get a PDU (AP7940) that plugs in directly into the circuit and provides me a bunch of C13/C19 connectors....that's the type of a setup that I have for my other racks.
However, I am running out of the standard 5-20 outputs, for some of my network gear and other miscellaneous stuff. I was thinking of getting this product:
Which is a combination of a step-down/isolation transformer and plugging my PDUs into that. This way I figure it will power the rack and also give me some extra 5-20 outputs.
Now, I am not sure if this is the right product. According to the documentation it seems to be intended to be used with a UPS. Is that a requirement or just the usual setup? Can it also do both the 110 and 208 output at the same time or just one or the other? I am not even that much concerned about getting the wrong product (that I can ship back), but I am worried that I am going to fry the equipment that will be plugged into it.