APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Posted: 2021-06-29 05:58 AM . Last Modified: 2024-03-13 12:14 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 05:58 AM . Last Modified: 2024-03-13 12:14 AM
Hi,
Apologies for the length of the post but, what's the best way to set PCNS up in the following scenario?
Setup
We have just moved into a new building and I have 2 independent mains supplys in the building coming in to 2 Service Bypass panels (to mitigate building maintenance work). Each Service Bypass Panel (SBP) has one UPS attached, and is powering a Power Distribution Unit (PDU) that has one PSU from each device attached to it. Each device has 2 PSUs, therfore, they get their power from both mains supplys. (See Attached.)
Scenario 1
The building maintenance team need to isolate one of the mains supplys for some reason. All my devices will have one UPS on battery and one that is not. In this case I do not want the 'On battery' event to trigger.
Scenario 2
Somehow mains power is lost to both UPSs (mains supply is lost, for example, due to a digger breaking the underground cable to the building). The 'On battery' event is triggered and my devices begin shut down on the schedule I have defined.
Thanks
Tony
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 05:58 AM . Last Modified: 2024-03-13 12:13 AM
Hi,
We have Application Note 98 that describes setting up PowerChute Network Shutdown with redundant UPS. The document lists your scenarios and PowerChute would be handled them as required.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-29 05:58 AM . Last Modified: 2024-03-13 12:13 AM
Hi,
We have Application Note 98 that describes setting up PowerChute Network Shutdown with redundant UPS. The document lists your scenarios and PowerChute would be handled them as required.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.