Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-3007:36 AM. Last Modified: 2024-03-0710:56 PM
Scheduled Runtime Calibration
During the installation of additional battery packs a 'Scheduled Runtime Calibration' was selected 'Yes' via the LCD. How do we cancel the scheduled runtime calibration? Would this runtime calibration turn off the outlets; cut power to the equipment?
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-3007:37 AM. Last Modified: 2024-03-0710:55 PM
Hi,
A calibration test will not cut power to the load. The test switches the UPS to battery and runs until the battery is low. It will then switch back to AC. To stop the test go to test and diags - calibration.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-3007:37 AM. Last Modified: 2024-03-0710:55 PM
Hi,
A calibration test will not cut power to the load. The test switches the UPS to battery and runs until the battery is low. It will then switch back to AC. To stop the test go to test and diags - calibration.