Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2810:06 AM. Last Modified: 2024-03-1506:05 AM
Question about SYAPD1 power connectors
We have a Symmetra LX 16kVA N+1 unit that has three SYAPD1s on the back. Up until now we have only populated the L5-20s and left the L14-30 outlet vacant. We now have a new storage array that will need the L14-30 outlet. As long as we are not exceeding the amperage on the system, we can use all three plugs on these power distribution panels correct?