Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively.Register now to secure your spot!
How to calculate UPS load
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2711:16 PM. Last Modified: 2024-03-1912:14 AM
Hello Chuluunbaatar,
APC.com displays run time graphs on the product page for each model UPS. If the product page does not display such a graph, click on the hyperlink next to "Extended Run Options" on the product page of your unit to calculate the run time based on your current load in watts and number of battery packs added.
To use this tool, you will need the specific model number of your UPS and must know your total watt draw.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2711:16 PM. Last Modified: 2024-03-1912:14 AM
Hello Chuluunbaatar,
APC.com displays run time graphs on the product page for each model UPS. If the product page does not display such a graph, click on the hyperlink next to "Extended Run Options" on the product page of your unit to calculate the run time based on your current load in watts and number of battery packs added.
To use this tool, you will need the specific model number of your UPS and must know your total watt draw.
This is a heading
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.