I picked up two MasterSwitch Plus "expansion cabinets", Model AP9225EXP, each of which had an AP9606 SNMP card installed (presumably by a prior owner). As I understand it, the 9225EXP does not come with the AP9606 pre-installed, as it is designed to "slave" off a 9225 with the card factory installed by APC. The question I have is, if one does install an AP9606 in an AP9225EXP, does one end up with a unit with 100% of the functionality of a factory-created AP9225 with the factory installed AP9606? Also, aside from Masterswitch-to-UPS cabling, does one need a specially wired console cable to communicate with a MasterSwitch for configuration purposes (and if so, which APC cables will do the job, in addition to any actually specified in the user guide), or will a standard straight-through serial cable, or a null modem cable, do the job? Thanks. -- Dan
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
The progress on the electrical lines at the Fukushima Jeremy Scott Dai-ichi nuclear power plant was a welcome and Jeremy Scott Shoes significant advance Tuesday after days of setbacks. With the power lines connected, officials Jeremy Scott Shop hope to start up the overheated plant's crucial cooling system that was knocked out during the March 11 earthquake Jeremy Scott Adidas and tsunami that devastated Japan's northeast coast. Tokyo Electric Power Co. warned that workers still need to check all equipment Jeremy Scott Wings for damage first before switching the cooling system on to all the reactor units — a process that Jeremy Scott JS Wings ould take days or even weeks. Late Tuesday night, Tokyo Electric said lights went on in the central control room of Unit 3, but that doesn't mean power had been restored to the cooling system.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:06 PM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:06 PM
Yeah, you should be able to put in your own AP9606 if you've got one, and use it in the EXP unit. It will have the same functionality as the AP9225. Just make sure you put the correct firmware on your AP9606 because I'm guessing it didn't originally come out of a MasterSwitch.
ftp://ftp.apcc.com/apc/public/hardware/mswitch/firmware/msp/v200/
You can also install an AP9617 management card in the MasterSwitch, and use this firmware:
http://www.apcc.com/tools/download/software_comp.cfm?sw_sku=SFMSP262
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:06 PM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:06 PM
These two cards have built in Web Cards and they do not support upgrading to a newer network management card.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:06 PM
Does the MasterSwitch VMcontroller ( AP9224 or AP9221nx166 ) support upgrading to the newer Web/SNMP card too?
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
Hello,
The new Switched Rack PDUs use the newer Network Managment Card (AP9617) technology.
The link below is a NEMA 5-15 input/NEMA 5-15 output.
http://www.apc.com/resource/include/techspec_index.cfm?base_sku=AP7931
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-28 02:38 AM . Last Modified: 2024-03-18 11:05 PM
The progress on the electrical lines at the Fukushima Jeremy Scott Dai-ichi nuclear power plant was a welcome and Jeremy Scott Shoes significant advance Tuesday after days of setbacks. With the power lines connected, officials Jeremy Scott Shop hope to start up the overheated plant's crucial cooling system that was knocked out during the March 11 earthquake Jeremy Scott Adidas and tsunami that devastated Japan's northeast coast. Tokyo Electric Power Co. warned that workers still need to check all equipment Jeremy Scott Wings for damage first before switching the cooling system on to all the reactor units — a process that Jeremy Scott JS Wings ould take days or even weeks. Late Tuesday night, Tokyo Electric said lights went on in the central control room of Unit 3, but that doesn't mean power had been restored to the cooling system.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.