Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2606:04 AM. Last Modified: 2024-03-1912:22 AM
APC 20KVA UPS SURT20000XLI
Hi friends,
I have just installed the same ups and connected battery bank with proper connections but UPS doesnt show any battery connected on display board,so am also not able to take any load from ups.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2606:04 AM. Last Modified: 2024-03-1912:22 AM
Can you verify specifically what "proper connections" you're referring to? And also, you're saying you connected an XR frame to the UPS? If so, is there a red LED present on that XR frame that you can see on the front? Is it flashing or solid?
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2606:04 AM. Last Modified: 2024-03-1912:22 AM
Can you verify specifically what "proper connections" you're referring to? And also, you're saying you connected an XR frame to the UPS? If so, is there a red LED present on that XR frame that you can see on the front? Is it flashing or solid?